GARAGE-BUILT
Early machines prioritize access to the frame, joints, actuators, and wiring.
BUILDING H1
A transparent development journal for the SAIREX H1 program. Updates will appear when there is real work to show.
BUILD STANDARD
Each future entry will distinguish verified results from active work and longer-term intent. Dates will be added only when a milestone is ready to publish.
INSIDE THE BUILD
H1 is planned as an independent garage-built engineering program. The first machine will prioritize access, testing, and iteration over finished exterior panels.
Early machines prioritize access to the frame, joints, actuators, and wiring.
Mechanical validation comes before finished exterior surfaces.
Only work that can be shown clearly becomes part of the journal.

PUBLIC BUILD MAP
EVERY BUILD ENTRY
This structure keeps future H1 updates useful to readers and honest about the state of the work.
What we set out to test and why it matters to H1.
The prototype, measurement, observation, or repeatable result.
What worked, what failed, and what remains uncertain.
The specific question or change that follows from the result.
Current work is focused on turning the H1 concept into a testable engineering roadmap. No completed prototype is being claimed.
The first journal entry will focus on a specific workstream only after there is evidence ready to document.
Later entries may connect multiple workstreams when integration has actually been tested. No date or completed system is being announced.
PUBLICATION GATE
An experiment exists, but no public conclusion is ready.
The result can be described without relying on aspiration.
Concept, active work, and verified outcomes are labeled clearly.
The entry becomes part of the public H1 build record.
No H1 build entry is currently marked as verified or published.