JOURNAL · FOUNDATION STAGE

BUILDING H1

Progress.
Documented.

A transparent development journal for the SAIREX H1 program. Updates will appear when there is real work to show.

H1 / ENGINEERING MAP00
01PERCEPTIONPLANNED
02MOTIONPLANNED
03POWERPLANNED
04COMPUTEPLANNED
05STRUCTUREPLANNED
NO COMPLETED PROTOTYPE CLAIMED

Evidence before announcements.

Each future entry will distinguish verified results from active work and longer-term intent. Dates will be added only when a milestone is ready to publish.

The concept sets the direction. The prototype earns it.

H1 is planned as an independent garage-built engineering program. The first machine will prioritize access, testing, and iteration over finished exterior panels.

01

GARAGE-BUILT

Early machines prioritize access to the frame, joints, actuators, and wiring.

02

FUNCTION BEFORE PANELS

Mechanical validation comes before finished exterior surfaces.

03

EVIDENCE IN PUBLIC

Only work that can be shown clearly becomes part of the journal.

SAIREX H1 concept design
CONCEPT DESIGN · TARGET VISUAL DIRECTION

Seven visible gates. No invented dates.

00

Concept definition

ACTIVE
01

Mechanical layout

NEXT
02

Frame & joints

PLANNED
03

Actuation & power

PLANNED
04

Electronics & perception

PLANNED
05

First stand

FUTURE
06

First steps

FUTURE

Four fields.
No missing context.

This structure keeps future H1 updates useful to readers and honest about the state of the work.

01

Objective

What we set out to test and why it matters to H1.

02

Evidence

The prototype, measurement, observation, or repeatable result.

03

Outcome

What worked, what failed, and what remains uncertain.

04

Next step

The specific question or change that follows from the result.

NOW · 00
PROGRAM DEFINITION

Architecture and prototype planning

Current work is focused on turning the H1 concept into a testable engineering roadmap. No completed prototype is being claimed.

NEXT · 01
PLANNED

First verified subsystem note

The first journal entry will focus on a specific workstream only after there is evidence ready to document.

LATER · 02
FUTURE DIRECTION

Integrated build evidence

Later entries may connect multiple workstreams when integration has actually been tested. No date or completed system is being announced.

From workbench
to public record.

ENTRY 001WAITING FOR
VERIFIED WORK
DATE · NOT ANNOUNCED
01

Working note

An experiment exists, but no public conclusion is ready.

02

Evidence check

The result can be described without relying on aspiration.

03

Status review

Concept, active work, and verified outcomes are labeled clearly.

04

Published

The entry becomes part of the public H1 build record.

No H1 build entry is currently marked as verified or published.